Availability: | |
---|---|
Quantity: | |
Product Details
1. Name : Flat bar
2. Standard: AISI, ASTM, BS,DIN,GB,JIS
3. Grade: A36, SS400, Q235, Q345, S235,S275
4. Dimensions: 1.0mm-15mm
5. Length: 6-12m
6. Technique: hot rolled
7. Tolerance: As the standard or as your requirement
8. Application : Metal structure, bridge, machiner, shipbuilding industry
9. Certificated : BV
10. MOQ: 20T
11. Delivery: Within 25 days after deposit
12. Payment: T/T or L/C
MILD STEEL CARBON FLAT BAR | |||
Width (mm) | Thickness (mm) | Length (m) | Theoretical Weight (kg/m) |
20 | 2.0 | 6/9/12 | 0.31 |
20 | 2.5 | 6/9/12 | 0.39 |
20 | 2.75 | 6/9/12 | 0.43 |
25 | 2.5 | 6/9/12 | 0.49 |
25 | 3.75 | 6/9/12 | 0.74 |
30 | 2.5 | 6/9/12 | 0.59 |
30 | 3.5 | 6/9/12 | 0.82 |
30 | 9.75 | 6/9/12 | 2.30 |
40 | 3.5 | 6/9/12 | 1.10 |
40 | 4.75 | 6/9/12 | 1.50 |
40 | 11.75 | 6/9/12 | 3.69 |
50 | 2.75 | 6/9/12 | 1.08 |
50 | 4.5 | 6/9/12 | 1.77 |
50 | 9.75 | 6/9/12 | 3.83 |
60 | 5.5 | 6/9/12 | 2.60 |
60 | 7.5 | 6/9/12 | 3.53 |
60 | 11.5 | 6/9/12 | 5.42 |
80 | 5.5 | 6/9/12 | 3.45 |
80 | 7.5 | 6/9/12 | 4.71 |
80 | 11.75 | 6/9/12 | 7.38 |
100 | 3.25 | 6/9/12 | 2.55 |
100 | 4.75 | 6/9/12 | 3.73 |
100 | 7.5 | 6/9/12 | 5.89 |
120 | 9.75 | 6/9/12 | 9.18 |
120 | 11.75 | 6/9/12 | 11.07 |
150 | 9.75 | 6/9/12 | 11.48 |
150 | 11.5 | 6/9/12 | 13.54 |
150 | 13.5 | 6/9/12 | 15.90 |
160 | 11.75 | 6/9/12 | 14.76 |
200 | 9.5 | 6/9/12 | 14.92 |
250 | 5.75 | 6/9/12 | 11.28 |
340 | 7.75 | 6/9/12 | 20.68 |
Picture Show
Packaging & Delivery: Packaging & Delivery:
Packaging details | 1.Big order: bulk |
2.Small order: packed by steel spool | |
3.woven cloth with 7 slats | |
4.according to the requirements of customers | |
5. 20ft container can load 25 tons, 40ft container can load 26 tons. | |
Delivery | 3-15 working days after received the deposit or L/C. |
Payment Terms | T/T, L/C, Western Union, Trade Assurance, Cash or as required |
Price Terms | FOB, CRF, CIF, EXW |
Delivery Time | Generally it is 5-10 days if the goods are in stock. or it is 30 days if the goods are not in stock, it is according to quantity. |
Packing | 1.with plastic cap to protect both ends 2.plastic bag wrapped outside the pipe 3.then woven bag wrapped outside the pipe 4.if require ,then pack into wooden |
Shipping Details | LCL FCL Bulk Shipment |
Container Info | 20ft GP: L5.8m * W2.13m * H2.18m , about 27 CBM, Loading Max.26 Tons 40ft GP: L11.8m * W2.13m * H2.18m, about 54 CBM, Loading Max.26 Tons 40ft HG: L11.8m * W2.13m * H2.72m, about 68 CBM, Loading Max.26 Tons |
Transportation:
FAQ
1. How to buy your ideal products?
A: You can provide us your drawing, and we will produce as your drawing. Or we can design as your requirements if you do not have a clear plan.
2. How to pay?
A: TT and L/C are acceptable and TT will be more appreciated.
30% deposit before producing, 70% balance before loading by TT.
3. What is the delivery time?
A: It depends on order quantity.
Generally, the delivery time will be within 12 to 15 days.
4. How to install after the goods destination?
A: We will provide installation instruction and video for you. Technicians will be sent to help you if it is necessary. However, the visa fee, air tickets, accommodation, wages will be provided by buyers.
Product Details
1. Name : Flat bar
2. Standard: AISI, ASTM, BS,DIN,GB,JIS
3. Grade: A36, SS400, Q235, Q345, S235,S275
4. Dimensions: 1.0mm-15mm
5. Length: 6-12m
6. Technique: hot rolled
7. Tolerance: As the standard or as your requirement
8. Application : Metal structure, bridge, machiner, shipbuilding industry
9. Certificated : BV
10. MOQ: 20T
11. Delivery: Within 25 days after deposit
12. Payment: T/T or L/C
MILD STEEL CARBON FLAT BAR | |||
Width (mm) | Thickness (mm) | Length (m) | Theoretical Weight (kg/m) |
20 | 2.0 | 6/9/12 | 0.31 |
20 | 2.5 | 6/9/12 | 0.39 |
20 | 2.75 | 6/9/12 | 0.43 |
25 | 2.5 | 6/9/12 | 0.49 |
25 | 3.75 | 6/9/12 | 0.74 |
30 | 2.5 | 6/9/12 | 0.59 |
30 | 3.5 | 6/9/12 | 0.82 |
30 | 9.75 | 6/9/12 | 2.30 |
40 | 3.5 | 6/9/12 | 1.10 |
40 | 4.75 | 6/9/12 | 1.50 |
40 | 11.75 | 6/9/12 | 3.69 |
50 | 2.75 | 6/9/12 | 1.08 |
50 | 4.5 | 6/9/12 | 1.77 |
50 | 9.75 | 6/9/12 | 3.83 |
60 | 5.5 | 6/9/12 | 2.60 |
60 | 7.5 | 6/9/12 | 3.53 |
60 | 11.5 | 6/9/12 | 5.42 |
80 | 5.5 | 6/9/12 | 3.45 |
80 | 7.5 | 6/9/12 | 4.71 |
80 | 11.75 | 6/9/12 | 7.38 |
100 | 3.25 | 6/9/12 | 2.55 |
100 | 4.75 | 6/9/12 | 3.73 |
100 | 7.5 | 6/9/12 | 5.89 |
120 | 9.75 | 6/9/12 | 9.18 |
120 | 11.75 | 6/9/12 | 11.07 |
150 | 9.75 | 6/9/12 | 11.48 |
150 | 11.5 | 6/9/12 | 13.54 |
150 | 13.5 | 6/9/12 | 15.90 |
160 | 11.75 | 6/9/12 | 14.76 |
200 | 9.5 | 6/9/12 | 14.92 |
250 | 5.75 | 6/9/12 | 11.28 |
340 | 7.75 | 6/9/12 | 20.68 |
Picture Show
Packaging & Delivery: Packaging & Delivery:
Packaging details | 1.Big order: bulk |
2.Small order: packed by steel spool | |
3.woven cloth with 7 slats | |
4.according to the requirements of customers | |
5. 20ft container can load 25 tons, 40ft container can load 26 tons. | |
Delivery | 3-15 working days after received the deposit or L/C. |
Payment Terms | T/T, L/C, Western Union, Trade Assurance, Cash or as required |
Price Terms | FOB, CRF, CIF, EXW |
Delivery Time | Generally it is 5-10 days if the goods are in stock. or it is 30 days if the goods are not in stock, it is according to quantity. |
Packing | 1.with plastic cap to protect both ends 2.plastic bag wrapped outside the pipe 3.then woven bag wrapped outside the pipe 4.if require ,then pack into wooden |
Shipping Details | LCL FCL Bulk Shipment |
Container Info | 20ft GP: L5.8m * W2.13m * H2.18m , about 27 CBM, Loading Max.26 Tons 40ft GP: L11.8m * W2.13m * H2.18m, about 54 CBM, Loading Max.26 Tons 40ft HG: L11.8m * W2.13m * H2.72m, about 68 CBM, Loading Max.26 Tons |
Transportation:
FAQ
1. How to buy your ideal products?
A: You can provide us your drawing, and we will produce as your drawing. Or we can design as your requirements if you do not have a clear plan.
2. How to pay?
A: TT and L/C are acceptable and TT will be more appreciated.
30% deposit before producing, 70% balance before loading by TT.
3. What is the delivery time?
A: It depends on order quantity.
Generally, the delivery time will be within 12 to 15 days.
4. How to install after the goods destination?
A: We will provide installation instruction and video for you. Technicians will be sent to help you if it is necessary. However, the visa fee, air tickets, accommodation, wages will be provided by buyers.